Knowledge Centre
Responsiveness of Bids 2
A Procuring Entity (PE) sought guidance as follows:
Guidance is required concerning how to proceed with evaluating bids where bidders:
- Failed to submit the required Delivery Schedule; and
- Failed to sign or stamp their respective delivery schedule
The PE sought guidance on whether it is allowable to proceed with the evaluation or to disqualify bids due to the circumstances outlined above.