Responsiveness of Bids 2
A Procuring Entity (PE) sought guidance on how to proceed with evaluating bids where bidders:
- Failed to submit the required Delivery Schedule; and
- Failed to sign or stamp their respective delivery schedule
The PE sought guidance whether it is allowable to proceed with the evaluation or to disqualify bids due the circumstances outlined above.